Energy Transfer Company – 2012/2013
5051 Westheimer
Houston, TX 77056

Project Location: Kermit, TX
Install 38 Miles of 10 Inch

 

Praxair, Inc. - 2012
1585 Sawdust Rd.
Spring, Texas

Project Location: Plaquemine, La.
4.5 miles of 10”

 
 

El Paso/Southern Natural Gas - 2012
569 Brookwood Village, Suite 500
Birmingham, Al. 35209

Location: Galion, Al.
Install: 5.2 miles of 36”

As we enter into our fifth year of business, MPG has just successfully completed 7.2 miles of 36” pipeline for El Paso/Southern Natural Gas. We have also just
acquired two additional state Contractor Licenses in Florida and Arkansas.

 

El Paso/Southern Natural Gas - 2012
569 Brookwood Village, Suite 500
Birmingham, Al. 35209

Location: Bay Springs, Ms.
Install: 2.6 miles of 36”

 

Enterprise Products Co. - 2012
1100 Louisiana St.
Houston, Texas 77056

Project Location: Pearl River, La.
Tri-State Project

Install:
34 miles 16”
13 miles of 12”
1-Launcher
1-Reciever
8-16” MLV
4-12”MLV

Remove:
34 miles of 16’
13 miles of 12”

 
Florida Gas Transmission - 2012
5444 Westheimer Rd.
Houston, TX 77056

Project Location: Flomaton, AL

Install approx. 18,000’ – 24” & 9,000’ – 30”: 1- MLV for each pipe size.
 
 

Panhandle Energy Co. - 2011
8100 Big Lake Road
Lake Charles, LA 70605

Project Location: Kaplan, LA . to Longville, LA.
Install 4-24” Launcher/Receivers
Install 5 – 24” MLV’s
Offset Relay approx. 600’ – 24” & 30”

 

Florida Gas Transmission - 2011
5444 Westheimer Rd.
Houston, TX 77056

Project Location: Grand Bay, AL
Install approx. 46,560’ – 24”, 1- Launcher, 1- Receiver & Meter Station

 

Enterprise Products Co. - 2011
1100 Louisiana St.
Houston, TX 77002
Project Location: Centerville, LA
Install approx. 27,179’ – 24”, 2,357’ – 20” & 6,613’ – 12”
Procure all materials, fabricate and install 5 – Grass root meter stations.

 
Panhandle Energy Co. - 2011
8100 Big Lake Road
Lake Charles, LA 70605

Project Location: Beeville, TX & Duson, LA
Offset Relay approx. 3,369’ – 18”, 3,593’ – 20” and 3,354’ – 22”
Insitu -Relay approx. 521’ – 18” and 1101’ – 22”

 
Enbridge Pipeline - 2011
2020 Bill Owens Parkway, Suite 100
Longview, Texas

Project Location: Bryan Mills, Texas

Install:
2,000’ of 2”,2”, 3” and 4” total pipe.
1 – 320’ HDD of 3”

 

Denbury Resources, Inc. -  2010
Location: Brandon, MS

Project Summary:
Install 5.8 miles of 24 ”pipeline including metering facilities.

 
 

El Paso/Southern Natural Gas - 2010
Location: Chalmette, La.

Project Summary:
Install 2 - 20" x 3,000’  and 1 - 30” x 3,000’ Horizontal Directional Drills under
the Corp. of Engineer Hurricane Levee Protection System

 

Plains Marketing, L.P. - 2010
Location: St. James, La.

Project Summary:
Install: 4,800’ of 16”
HDD: 1,345’ of 16”
Launcher/Receiver
1- 30” Header

 

Praxair, Inc. -  2010
Location: Memphis, TN

Project Summary:
Install approximately 33,970’ of dual 10” & 6” pipe. 19,114’ of which is being
installed by HDD method. One bundled drill totaling 6,943’

 

Williams Gas Pipeline  - 2010
Location: Erath, La,    
 
Project Summary:
Install 18” Launcher and associated piping

 

Acadian Gas Pipeline  -  2009
Location: Belle Chase, La,

Project Summary:
Install 8,200’ of 10” Horizontal directional drill

 

Chesapeake Energy Marketing, Inc.  

Project #1    2009
Location: Mansfield, La.

Project Summary:
Install 9.5 miles of 24” pipeline

Project #2    2009
Location: Spring Ridge, La.

Project Summary:
Install 3.4 miles of 16”

Project #3    2010
Location: Mansfield, La.

Project Summary:
Install 8.5 miles of 20” pipeline

 

Trunkline Gas - 2009
Location: Boling, Tx.

Project Summary:
10 ”Hot tap with 200' of interconnect piping

 

Florida Gas Transmission  -  2009
Location: Rapides Parish. La.

Project Summary:
Modify 16 ”header
Change out 8”controller

 

Florida Gas Transmission -  2009
Location: Franklinton. La.

Project Summary:
4” Hot tap – 100’ of Interconnect piping

 

Plains Marketing, L.P. -  2009
Location: St. James, La.

Project Summary:
Paralleling lines in common ditch
4,929’ of 42”
4,929’ of 30”
4,929’ of 20”

Paralleling lines in common ditch
1,914’ of 48’
1,914’ of 42”
1,914’ of 20”
Single line:
1,561’ of 48”

 

Placid Refinery  -  2009
Location:  Port Allen, La.

Project Summary:
Recoat 10” pipeline and bridge span

 

Petrologistics LLC  -  2008
Location: Plaquemines, La.

Project Summary:
FERC 7-C
Install 26 miles of 24”, 16” and 12” all lay in one common ditch.
Install 1 16” x 7,301’ Horizontal Directional Drill.
Install 1 bundle of 24”,  16” and 12” x 2,400’ Horizontal Directional Drill
Install 5 dual 12” & 24” Horizontal Directional Drills - 3,008’, 1,172’, 1,508’,
900', and 1,057'
Procurement of all materials for 3 meter stations, skid mounted separators,
fabrication and installation of all components associated with the facilities.

Petrologistics LLC  -  2009
Location: Plaquemines, La.

Project Summary:
Two 12 ”meter stations

Petrologistics LLC -  2009
Location: Plaquemine, La.

Project Summary:
Procurement of all materials and mechanically install 1 - 20,000HP Recip compressor station

 
 